Steel Ramp 1,5 x 10 m
Product group code: 7705070
Heavy-duty construction site driving bridge.
- Maximum excavation span: 5.5 m
- Maximum axle load: 15,000 kg
During installation, ensure that the specified maximum excavation span for the driving bridges is not exceeded. The maximum excavation spans are marked on the sides of the bridges with downward-pointing arrows.
Moving the Driving Bridges
The driving bridges can be lifted using lifting chains from two different lifting points: either from the blue-marked round bars or the holes on the side of the bridge. When lifting from the side holes, a maximum of four bridges can be stacked. The customer is responsible for ensuring that the lifting equipment is appropriate and used correctly.
Installation and Use of the Driving Bridges
Before using the driving bridges, always visually inspect their condition, including weld seams, dents, wear, bends, etc. If any defects or damages are found during inspection, the use of these driving bridges is strictly prohibited to avoid accidents. The use of driving bridges of different lengths side by side is prohibited. The customer is responsible for ensuring proper markings in accordance with road traffic requirements when using the driving bridges. During installation, ensure that the specified maximum excavation span for the driving bridges is not exceeded (maximum excavation spans are provided in the technical specifications). The maximum excavation spans are marked on the sides of the bridges with downward-pointing arrows. The driving bridges should be installed side by side on a stable and level surface.
| Weight | 1690 kg |
| Length | 10 m |
| Width | 1,5 m |
| Height | 0,15 m |
We recommend that the user wears protective shoes to reduce risks of injury.
